Water Networks Cost Indices by Major and Sub Groups in the West Bank for the Years 2019 and 2018
(Base Month January 2010=100)
Click Here To Download Excel File |
|||
Major and Sub Groups |
West Bank |
||
Average 2018 |
Average 2019 |
% Change |
|
Water Reservoirs |
109.78 |
106.69 |
-2.82 |
Excavations |
125.50 |
123.84 |
-1.33 |
Concrete |
104.39 |
103.47 |
-0.89 |
Iron |
109.59 |
101.05 |
-7.79 |
Construction work and paint |
121.19 |
123.30 |
1.74 |
Miscellaneous |
107.40 |
106.87 |
-0.49 |
Administrative expenses |
118.57 |
119.42 |
0.71 |
Water Networks |
115.78 |
116.66 |
0.76 |
Excavations |
125.50 |
123.84 |
-1.33 |
Deface Materials |
102.68 |
102.55 |
-0.12 |
Asphalt, bitumen mixture and its products |
87.05 |
87.41 |
0.41 |
Plastic and steel Pipes |
121.13 |
123.00 |
1.54 |
Administrative expenses |
118.57 |
119.42 |
0.71 |
Wages and other costs |
132.22 |
133.13 |
0.68 |
General index |
113.90 |
113.55 |
-0.31 |
*Data excluded those parts of Jerusalem which were annexed by Israeli Occupation in 1967. |