Construction Cost Index (CCI), Road Cost Index (RCI), Water Networks Cost Index (WNCI) and Sewage Networks Cost Index (SNCI) in the West Bank during July,07/2014
Decrease in the Construction Cost Index for Residential Buildings
The Construction Cost Index for Residential buildings reached 100.71 with a decrease of 0.06% in the West Bank during July 2014 compared to June 2014 (base year 2013=100).
The Construction Cost Index for Residential buildings decreased due to the decrease in the prices of raw materials by 0.11%. While, rental of equipments increased by 0.20%. Labor wages remained stable during July 2014 compared to previous month.
Decrease in the Construction Cost Index for Non-residential Buildings
The Construction Cost Index for Non-residential buildings reached 100.85 with a decrease of 0.06% in the West Bank during July 2014 compared to June 2014 (base year 2013=100).
The Construction Cost Index for Non-Residential buildings decreased due to the decrease in the prices of raw materials by 0.09%. While, rental of equipments increased by 0.14%. Labor wages remained stable during July 2014 compared to previous month.
Decrease in the Construction Cost Index for Skeleton Buildings
The Construction Cost Index for Skeleton buildings reached 99.86 with a decrease of 0.27% in the West Bank during July 2014 compared to June 2014 (base year 2013=100).
The Construction Cost Index for Skeleton buildings decreased due to the decrease in the prices of raw materials by 0.39%. While, rental of equipments increased by 0.01%. Labor wages remained stable during July 2014 compared to previous month.
Increase in the Road Cost Index (RCI)
The overall Road Cost Index (RCI) reached 117.48 with an increase of 0.15% in the West Bank during July 2014 compared to June 2014 (base month December 2008=100).
The Road Cost Index for July 2014 increased due to the increase in the prices of raw materials by 0.21%, and rental of equipments by 0.11%. While, operating costs of equipment and maintenance decreased by 0.03%. Labor wages remained stable during July 2014 compared to previous month.
Decrease in the Water Networks Cost Index (WNCI)
The overall Water Networks Cost Index (WNCI) reached 112.08 with a decrease of 0.09% in the West Bank during July 2014 compared to June 2014 (base month January 2010=100).
Water Reservoirs Cost Index reached 108.25 with a decrease of 0.39%. While, Water Networks Cost Index reached 113.83 with an increase of 0.04% during July 2014 compared to previous month.
Increase in the Sewage Networks Cost Index
The overall Sewage Networks Cost Index (SNCI) reached 108.33 with an increase of 0.06% in the West Bank during July 2014 compared to June 2014 (base month January 2010=100).
Note:
The data of the West Bank doesn’t cover those parts of Jerusalem which were annexed by Israel in 1967.
NB:
1. Gaza Strip data is not available.
2. The difference in the percentage change in major groups of road, construction, water networks, and sewage networks cost index is due to the nature compositions of these major groups.
· Data collection of Construction, Road, Water Networks, and Sewage Networks Cost Index survey was funded by the European Union.