PCBS | PCBS: The Price Indices for Construction Cost, Road Cost, Water Networks Cost, Sewage Networks Cost in the West Bank in July, 07/2013

Palestinian Central Bureau of Statistics (PCBS)

 

Construction Cost Index (CCI), Road Cost Index (RCI), Water Networks Cost Index (WNCI) and Sewage Networks Cost Index (SNCI) in the West Bank during July 2013

 

Stability in the Construction Cost Index (CCI)

 

The overall Construction Cost Index (CCI) reached 112.94 with a slight decrease of 0.04% in the West Bank during July 2013 compared to June 2013 (base month December 2007=100).

 

The changes in the Construction Cost Index for July 2013 are traced back to the changes in the cost of the following major construction inputs compared to the previous month:

 

Major Groups

%Change

Raw materials

- 0.07%

Iron and steel

- 0.88%

Cutting & shaping stones

+ 0.56%

Quarries & quarrying products

+ 0.43%

Tiles and panels from ceramic

+ 0.33%

Ceramic products

+ 0.29%

Rental of equipment

 0.29%

Labor cost and wages

 0.00%

 

 

 

 

Increase in the Road Cost Index (RCI)

The overall Road Cost Index (RCI) reached 117.06 with an increase of 0.10% in the West Bank during July 2013 compared to June 2013 (base month December 2008=100).

 

The changes in the Road Cost Index for July 2013 are traced back to the changes in the cost of the following major road inputs compared to the previous month:

 

 

Major Groups

%Change

Raw materials

+ 0.14%

Quarries & quarrying products

+ 1.15%

Road paints

+ 1.01%

Cement

+ 0.13%

Cement products

+ 0.06%

Iron and steel

- 1.06%

Asphalt, bitumen mixture and its products

 

- 0.32%

Rental of equipment

+ 0.08%

Transportation fees

+ 0.06%

Operating costs of equipment & maintenance

- 0.38%

Labor cost and wages

      0.00%    

 

Stability in the Water Networks Cost Index (WNCI)

The overall Water Networks Cost Index (WNCI) reached 110.09 with a slight decrease of 0.05% in the West Bank during July 2013 compared to June 2013 (base month January 2010=100).

 

The changes in the Water Networks Cost Index for July 2013 are traced back to the changes in the cost of the following major water networks inputs compared to the previous month:

 

Major Groups

%Change

Water Reservoirs

- 0.31%

Iron

- 1.14%

Concrete

+ 0.21%

Excavations

+ 0.17%

 

 

 

Major Groups

%Change

Water Networks

+ 0.07%

Excavations

+ 0.17%

Plastic and steel pipes

+ 0.17%

Deface Materials

+ 0.04%

Asphalt, bitumen mixture and its products

- 0.28%

Administrative expenses

0.00%

Wages and other costs

 0.00%

 

Increase in the Sewage Networks Cost Index

The overall Sewage Networks Cost Index (SNCI) reached 107.11 with an increase of 0.13% in the West Bank during July 2013 compared to June 2013 (base month January 2010=100).

 

The changes in the Sewage Networks Cost Index for July 2013 are traced back to the changes in the cost of the following major sewage networks inputs compared to the previous month:

 

Major Groups

%Change

Plastic and cement pipes

 0.37%+

Excavations

+ 0.17%

Fountains

+ 0.14%

Asphalt, bitumen mixture and its products

-0.28%

Administrative expenses

 0.00%

Wages and other costs

 0.00%

 

 

 

Note:

The data of the West Bank doesn’t cover those parts of Jerusalem which were annexed by Israel in 1967.

 

NB:

1.       Gaza Strip data is not available.

2.       The difference in the percentage change in major groups of road, construction, water networks, and sewage networks cost index is due to the nature compositions of these major groups.

 

 

 