Monthly Construction Cost Indices for Non-residental Buildings by Major Groups in the West Bank for: 2009 - 2023
(Base Year 2013=100)
Publish Date:29-01-2024
Click Here To Download Data as CSV File
Major Groups | Avg. 2008 | Jan. 2009 | Feb. 2009 | Mar. 2009 | Apr. 2009 | May. 2009 | Jun. 2009 | Jul. 2009 | Aug. 2009 | Sep. 2009 | Oct. 2009 | Nov. 2009 | Dec. 2009 | Avg. 2009 | % Change |
Raw materials | 105.61 | 95.85 | 96.35 | 95.19 | 95.36 | 95.99 | 96.46 | 97.56 | 95.74 | 95.73 | 95.28 | 94.90 | 95.10 | 95.79 | -9.29 |
Hiring of equipment | 78.07 | 82.57 | 83.48 | 82.62 | 83.31 | 84.05 | 85.02 | 85.85 | 85.87 | 86.20 | 86.59 | 86.71 | 87.02 | 84.94 | 8.80 |
Labour cost and wages | 84.59 | 92.66 | 92.59 | 92.06 | 92.52 | 93.26 | 93.74 | 93.83 | 93.87 | 93.61 | 93.73 | 93.90 | 93.93 | 93.31 | 10.30 |
General Index | 98.95 | 94.94 | 95.27 | 94.32 | 94.56 | 95.21 | 95.68 | 96.46 | 95.24 | 95.17 | 94.91 | 94.70 | 94.85 | 95.11 | -3.88 |
Major Groups | Avg. 2009 | Jan. 2010 | Feb. 2010 | Mar. 2010 | Apr. 2010 | May. 2010 | Jun. 2010 | Jul. 2010 | Aug. 2010 | Sep. 2010 | Oct. 2010 | Nov. 2010 | Dec. 2010 | Avg. 2010 | % Change |
Raw materials | 95.79 | 95.40 | 95.74 | 95.87 | 99.10 | 98.47 | 97.29 | 97.26 | 97.66 | 97.48 | 97.65 | 97.67 | 98.44 | 97.33 | 1.61 |
Hiring of equipment | 84.94 | 87.29 | 87.30 | 87.59 | 87.66 | 87.99 | 88.25 | 88.61 | 89.01 | 89.49 | 89.87 | 90.38 | 90.78 | 88.69 | 4.41 |
Labour cost and wages | 93.31 | 94.20 | 94.23 | 94.46 | 94.53 | 94.34 | 94.45 | 94.76 | 94.87 | 94.90 | 95.16 | 95.33 | 95.99 | 94.77 | 1.57 |
General Index | 95.11 | 95.14 | 95.37 | 95.51 | 97.69 | 97.21 | 96.45 | 96.53 | 96.84 | 96.73 | 96.93 | 96.98 | 97.70 | 96.59 | 1.55 |
Major Groups | Avg. 2010 | Jan. 2011 | Feb. 2011 | Mar. 2011 | Apr. 2011 | May. 2011 | Jun. 2011 | Jul. 2011 | Aug. 2011 | Sep. 2011 | Oct. 2011 | Nov. 2011 | Dec. 2011 | Avg. 2011 | % Change |
Raw materials | 97.33 | 99.59 | 99.47 | 99.42 | 99.29 | 99.66 | 100.98 | 100.89 | 100.55 | 101.27 | 101.28 | 100.73 | 100.55 | 100.31 | 3.05 |
Hiring of equipment | 88.69 | 91.15 | 91.43 | 91.69 | 91.84 | 92.21 | 92.55 | 92.71 | 92.82 | 92.96 | 93.22 | 93.52 | 93.66 | 92.48 | 4.28 |
Labour cost and wages | 94.77 | 96.07 | 96.14 | 96.20 | 96.45 | 96.69 | 96.86 | 97.04 | 97.34 | 97.71 | 97.85 | 97.90 | 98.09 | 97.03 | 2.38 |
General Index | 96.59 | 98.51 | 98.46 | 98.44 | 98.44 | 98.76 | 99.69 | 99.69 | 99.56 | 100.16 | 100.22 | 99.88 | 99.81 | 99.30 | 2.81 |
Major Groups | Avg. 2011 | Jan. 2012 | Feb. 2012 | Mar. 2012 | Apr. 2012 | May. 2012 | Jun. 2012 | Jul. 2012 | Aug. 2012 | Sep. 2012 | Oct. 2012 | Nov. 2012 | Dec. 2012 | Ave. 2012 | % Change |
Raw materials | 100.31 | 100.88 | 101.02 | 100.95 | 100.89 | 101.30 | 100.71 | 100.39 | 100.53 | 100.78 | 100.23 | 100.34 | 100.43 | 100.70 | 0.40 |
Hiring of equipment | 92.48 | 93.49 | 93.81 | 93.85 | 94.06 | 94.32 | 94.56 | 94.65 | 95.39 | 98.44 | 98.52 | 98.84 | 98.91 | 95.74 | 3.52 |
Labour cost and wages | 97.03 | 98.42 | 98.56 | 98.68 | 98.70 | 98.94 | 99.21 | 99.26 | 99.26 | 99.39 | 99.39 | 99.39 | 99.61 | 99.07 | 2.10 |
General Index | 99.30 | 100.13 | 100.27 | 100.25 | 100.22 | 100.57 | 100.26 | 100.08 | 100.18 | 100.43 | 100.04 | 100.14 | 100.25 | 100.24 | 0.94 |
Major Groups | Avg. 2012 | Jan. 2013 | Feb. 2013 | Mar. 2013 | Apr. 2013 | May. 2013 | Jun. 2013 | Jul. 2013 | Aug. 2013 | Sep. 2013 | Oct. 2013 | Nov. 2013 | Dec. 2013 | Avg. 2013 | % Change |
Raw materials | 100.70 | 99.67 | 100.18 | 100.66 | 100.20 | 100.09 | 99.59 | 99.48 | 99.81 | 100.24 | 100.00 | 100.11 | 99.98 | 100.00 | -0.70 |
Hiring of equipment | 95.74 | 99.09 | 99.20 | 99.30 | 99.44 | 99.59 | 99.81 | 100.11 | 100.40 | 100.67 | 100.77 | 100.84 | 100.80 | 100.00 | 4.45 |
Labour cost and wages | 99.07 | 99.61 | 99.61 | 99.89 | 99.89 | 99.89 | 99.99 | 99.99 | 99.99 | 100.26 | 100.26 | 100.26 | 100.36 | 100.00 | 0.94 |
General Index | 100.24 | 99.73 | 100.05 | 100.43 | 100.11 | 100.03 | 99.72 | 99.66 | 99.87 | 100.20 | 100.03 | 100.12 | 100.05 | 100.00 | -0.23 |
Major Groups | Avg. 2013 | Jan. 2014 | Feb. 2014 | Mar. 2014 | Apr. 2014 | May. 2014 | Jun. 2014 | Jul. 2014 | Aug. 2014 | Sep. 2014 | Oct. 2014 | Nov. 2014 | Dec. 2014 | Avg. 2014 | % Change |
Raw materials | 100.00 | 99.73 | 100.06 | 100.12 | 100.35 | 100.26 | 100.53 | 100.44 | 100.51 | 101.02 | 101.23 | 100.90 | 100.88 | 100.50 | 0.50 |
Hiring of equipment | 100.00 | 101.00 | 101.22 | 101.46 | 102.29 | 102.47 | 102.88 | 103.03 | 103.19 | 103.27 | 101.76 | 101.10 | 101.28 | 102.08 | 2.08 |
Labour cost and wages | 100.00 | 101.14 | 101.14 | 101.52 | 101.52 | 101.52 | 101.82 | 101.82 | 101.82 | 103.59 | 103.59 | 103.59 | 103.79 | 102.24 | 2.24 |
General index | 100.00 | 100.10 | 100.32 | 100.50 | 100.68 | 100.63 | 100.91 | 100.85 | 100.90 | 101.76 | 101.85 | 101.61 | 101.74 | 100.99 | 0.99 |
Main Group | Avg. 2013 | Jan. 2014 | Feb. 2014 | Mar. 2014 | Apr. 2014 | May. 2014 | Jun. 2014 | Jul. 2014 | Aug. 2014 | Sep. 2014 | Oct. 2014 | Nov. 2014 | Dec. 2014 | Avg. 2014 | % Change |
Raw materials | 100.00 | 99.73 | 100.06 | 100.12 | 100.35 | 100.26 | 100.53 | 100.44 | 100.51 | 101.02 | 101.23 | 100.90 | 100.88 | 100.50 | 0.50 |
Hiring of equipment | 100.00 | 101.00 | 101.22 | 101.46 | 102.29 | 102.47 | 102.88 | 103.03 | 103.19 | 103.27 | 101.76 | 101.10 | 101.28 | 102.08 | 2.08 |
Labour cost and wages | 100.00 | 101.14 | 101.14 | 101.52 | 101.52 | 101.52 | 101.82 | 101.82 | 101.82 | 103.59 | 103.59 | 103.59 | 103.79 | 102.24 | 2.24 |
General index | 100.00 | 100.10 | 100.32 | 100.50 | 100.68 | 100.63 | 100.91 | 100.85 | 100.90 | 101.76 | 101.85 | 101.61 | 101.74 | 100.99 | 0.99 |
Main Group | Avg. 2014 | Jan. 2015 | Feb. 2015 | Mar. 2015 | Apr. 2015 | May. 2015 | Jun. 2015 | Jul. 2015 | Aug. 2015 | Sep. 2015 | Oct. 2015 | Nov. 2015 | Dec. 2015 | Avg. 2015 | % Change |
Raw materials | 100.50 | 100.12 | 99.68 | 99.41 | 99.61 | 99.66 | 99.59 | 99.68 | 98.84 | 97.76 | 97.71 | 96.86 | 96.67 | 98.80 | -1.69 |
Hiring of equipment | 102.08 | 99.77 | 98.36 | 98.15 | 97.43 | 97.97 | 98.18 | 98.11 | 98.25 | 98.52 | 98.24 | 98.27 | 97.57 | 98.23 | -3.76 |
Labour cost and wages | 102.24 | 103.79 | 103.79 | 103.72 | 103.72 | 103.72 | 105.21 | 105.21 | 105.21 | 107.70 | 107.70 | 107.70 | 107.89 | 105.45 | 3.14 |
General index | 100.99 | 101.19 | 100.85 | 100.65 | 100.75 | 100.81 | 101.13 | 101.19 | 100.64 | 100.59 | 100.55 | 99.99 | 99.97 | 100.69 | -0.29 |
Main Group | Avg. 2015 | Jan. 2016 | Feb. 2016 | Mar. 2016 | Apr. 2016 | May. 2016 | Jun. 2016 | Jul. 2016 | Aug. 2016 | Sep. 2016 | Oct. 2016 | Nov. 2016 | Dec. 2016 | Avg. 2016 | % Change |
Raw materials | 98.80 | 96.31 | 95.97 | 96.90 | 97.99 | 99.44 | 98.96 | 98.16 | 97.46 | 97.39 | 97.03 | 97.62 | 98.01 | 97.60 | -1.21 |
Hiring of equipment | 98.23 | 98.00 | 97.59 | 97.36 | 97.51 | 98.10 | 97.83 | 98.28 | 99.20 | 100.20 | 100.98 | 101.22 | 101.34 | 98.97 | 0.75 |
Labour cost and wages | 105.45 | 107.89 | 107.89 | 111.44 | 111.44 | 111.44 | 114.55 | 114.55 | 114.55 | 114.64 | 114.64 | 114.64 | 115.34 | 112.75 | 6.92 |
General index | 100.69 | 99.75 | 99.51 | 101.05 | 101.78 | 102.75 | 103.28 | 102.77 | 102.34 | 102.37 | 102.16 | 102.56 | 103.08 | 101.95 | 1.25 |
Main Group | Avg. 2016 | Jan. 2017 | Feb. 2017 | Mar. 2017 | Apr. 2017 | May. 2017 | Jun. 2017 | Jul. 2017 | Aug. 2017 | Sep. 2017 | Oct. 2017 | Nov. 2017 | Dec. 2017 | Avg. 2017 | % Change |
Raw materials | 97.60 | 98.36 | 98.52 | 98.24 | 97.97 | 98.06 | 98.20 | 98.43 | 98.86 | 99.48 | 100.07 | 100.02 | 100.41 | 98.89 | 1.31 |
Hiring of equipment | 98.97 | 101.10 | 100.66 | 101.58 | 101.69 | 101.57 | 101.61 | 102.27 | 102.10 | 101.82 | 102.21 | 101.98 | 102.20 | 101.73 | 2.79 |
Labour cost and wages | 112.75 | 115.34 | 115.34 | 117.33 | 117.33 | 117.33 | 117.42 | 117.42 | 117.42 | 117.93 | 117.93 | 117.93 | 118.81 | 117.29 | 4.03 |
General index | 101.95 | 103.30 | 103.39 | 103.74 | 103.57 | 103.62 | 103.74 | 103.92 | 104.19 | 104.72 | 105.12 | 105.08 | 105.58 | 104.16 | 2.17 |
Main Group | Avg. 2017 | Jan. 2018 | Feb. 2018 | Mar. 2018 | Apr. 2018 | May. 2018 | Jun. 2018 | Jul. 2018 | Aug. 2018 | Sep. 2018 | Oct. 2018 | Nov. 2018 | Dec. 2018 | Avg. 2018 | % Change |
Raw materials | 98.89 | 100.36 | 100.64 | 100.97 | 100.95 | 100.89 | 100.94 | 100.81 | 100.74 | 100.67 | 100.83 | 100.86 | 100.54 | 100.77 | 1.90 |
Hiring of equipment | 101.73 | 102.00 | 102.32 | 102.31 | 102.31 | 102.29 | 102.26 | 102.34 | 102.24 | 101.58 | 101.85 | 101.68 | 101.57 | 102.06 | 0.33 |
Labour cost and wages | 117.29 | 118.81 | 118.81 | 118.23 | 118.23 | 118.23 | 118.00 | 118.00 | 118.00 | 118.29 | 118.29 | 118.29 | 119.62 | 118.40 | 0.94 |
General index | 104.16 | 105.53 | 105.73 | 105.85 | 105.84 | 105.80 | 105.83 | 105.75 | 105.69 | 105.72 | 105.84 | 105.85 | 105.97 | 105.78 | 1.55 |
Main Group | Avg. 2018 | Jan. 2019 | Feb. 2019 | Mar. 2019 | Apr. 2019 | May. 2019 | Jun. 2019 | Jul. 2019 | Aug. 2019 | Sep. 2019 | Oct. 2019 | Nov. 2019 | Dec. 2019 | Avg. 2019 | % Change |
Raw materials | 100.77 | 100.51 | 100.40 | 100.34 | 100.12 | 100.09 | 99.78 | 99.71 | 99.33 | 98.86 | 98.20 | 98.04 | 97.70 | 99.42 | -1.33 |
Hiring of equipment | 102.06 | 101.60 | 102.15 | 101.77 | 101.89 | 101.98 | 101.87 | 102.23 | 102.13 | 102.55 | 102.15 | 102.46 | 102.05 | 102.07 | 0.00 |
Labour cost and wages | 118.40 | 119.62 | 119.62 | 120.31 | 120.31 | 120.31 | 121.23 | 121.23 | 121.23 | 122.47 | 122.47 | 122.47 | 124.85 | 121.34 | 2.49 |
General index | 105.78 | 105.95 | 105.89 | 105.99 | 105.84 | 105.83 | 105.86 | 105.82 | 105.57 | 105.66 | 105.21 | 105.12 | 105.40 | 105.68 | -0.10 |
Main Group | Avg. 2019 | Jan. 2020 | Feb. 2020 | Mar. 2020 | Apr. 2020 | May. 2020 | Jun. 2020 | Jul. 2020 | Aug. 2020 | Sep. 2020 | Oct. 2020 | Nov. 2020 | Dec. 2020 | Avg. 2020 | % Change |
Raw materials | 99.42 | 97.57 | 97.35 | 97.66 | 97.64 | 97.27 | 96.97 | 97.02 | 97.05 | 97.09 | 96.97 | 97.39 | 98.52 | 97.37 | -2.06 |
Hiring of equipment | 102.07 | 102.49 | 102.36 | 101.39 | 100.70 | 101.36 | 101.42 | 100.98 | 101.25 | 101.37 | 101.25 | 101.51 | 102.02 | 101.51 | -0.55 |
Labour cost and wages | 121.34 | 124.85 | 124.85 | 126.31 | 126.31 | 126.31 | 127.12 | 127.12 | 127.12 | 127.55 | 127.55 | 127.55 | 129.62 | 126.85 | 4.54 |
General index | 105.68 | 105.33 | 105.18 | 105.75 | 105.71 | 105.50 | 105.54 | 105.52 | 105.55 | 105.69 | 105.61 | 105.89 | 107.14 | 105.70 | 0.02 |
Main Group | Avg. 2020 | Jan. 2021 | Feb. 2021 | Mar. 2021 | Apr. 2021 | May. 2021 | Jun. 2021 | Jul. 2021 | Aug. 2021 | Sep. 2021 | Oct. 2021 | Nov. 2021 | Dec. 2021 | Avg. 2021 | % Change |
Raw materials | 97.37 | 100.41 | 100.14 | 100.51 | 101.94 | 103.27 | 105.57 | 106.38 | 106.26 | 106.50 | 107.20 | 109.11 | 108.76 | 104.67 | 7.49 |
Hiring of equipment | 101.51 | 102.02 | 101.76 | 101.69 | 101.78 | 101.71 | 101.88 | 102.09 | 101.64 | 101.61 | 102.29 | 102.14 | 102.02 | 101.89 | 0.37 |
Labour cost and wages | 126.85 | 129.62 | 129.62 | 131.35 | 131.35 | 131.35 | 132.47 | 132.47 | 132.47 | 133.41 | 133.41 | 133.41 | 133.51 | 132.03 | 4.08 |
General index | 105.70 | 108.39 | 108.20 | 108.89 | 109.84 | 110.70 | 112.57 | 113.11 | 113.01 | 113.66 | 114.15 | 115.40 | 115.10 | 111.92 | 5.88 |
Main Group | Avg. 2021 | Jan. 2022 | Feb. 2022 | Mar. 2022 | Apr. 2022 | May. 2022 | Jun. 2022 | Jul. 2022 | Aug. 2022 | Sep. 2022 | Oct. 2022 | Nov. 2022 | Dec. 2022 | Avg. 2022 | % Change |
Raw materials | 104.67 | 108.59 | 108.21 | 111.85 | 113.00 | 113.00 | 111.53 | 111.60 | 111.06 | 110.41 | 111.07 | 110.79 | 110.04 | 110.93 | 5.98 |
Hiring of equipment | 101.89 | 103.22 | 102.89 | 103.13 | 103.90 | 104.16 | 105.94 | 106.37 | 106.09 | 106.00 | 106.22 | 106.15 | 106.70 | 105.06 | 3.12 |
Labour cost and wages | 132.03 | 133.51 | 133.51 | 139.78 | 139.78 | 139.78 | 138.97 | 138.97 | 141.09 | 141.54 | 141.54 | 141.54 | 142.37 | 139.37 | 5.55 |
General index | 111.92 | 115.03 | 114.77 | 118.83 | 119.62 | 119.62 | 118.50 | 118.56 | 118.67 | 118.40 | 118.84 | 118.65 | 118.33 | 118.15 | 5.57 |
Main Group | Avg. 2022 | Jan. 2023 | Feb. 2023 | Mar. 2023 | Apr. 2023 | May. 2023 | Jun. 2023 | Jul. 2023 | Aug. 2023 | Sep. 2023 | Oct. 2023 | Nov. 2023 | Dec. 2023 | Avg. 2023 | % Change |
Raw materials | 110.93 | 110.45 | 110.77 | 111.84 | 111.75 | 110.88 | 109.99 | 110.06 | 109.47 | 109.32 | 109.90 | 110.55 | 110.27 | 110.44 | -0.44 |
Hiring of equipment | 105.06 | 107.06 | 107.53 | 107.57 | 107.49 | 107.35 | 106.95 | 106.72 | 107.16 | 107.75 | 107.41 | 107.49 | 107.04 | 107.29 | 2.12 |
Labour cost and wages | 139.37 | 142.37 | 142.37 | 145.10 | 145.10 | 145.10 | 145.89 | 145.89 | 145.89 | 147.74 | 147.74 | 147.74 | 147.49 | 145.70 | 4.55 |
General index | 118.15 | 118.62 | 118.85 | 120.26 | 120.20 | 119.63 | 119.12 | 119.16 | 118.79 | 119.54 | 119.91 | 120.33 | 119.90 | 119.52 | 1.16 |